Hyderabad-Sukkur M-6 Motorway Plan Approved
Pakistan’s M-6 motorway nears construction approval, promising to halve Hyderabad-Sukkur travel time—but drivers still rely on the N-5 for now.

Table of Contents
- What has been approved
- Why the motorway matters
- Financing and the next steps
- Explore DrivePK services
Pakistan’s long-delayed Hyderabad-Sukkur M-6 motorway has moved a step closer to construction after the Public Private Partnership Authority approved development plans for two sections covering about 121 kilometres. The approval is an important milestone, but it does not mean the road is ready for drivers yet.
If completed, the project is expected to cut the travel time between Hyderabad and Sukkur from around six hours to about three. For now, though, the current N-5 National Highway remains the main route, and road users should not expect any near-term change in travel plans.
The approved work will be handled under two separate public-private partnership agreements. Private investors are expected to build and operate both sections for 25 years, then hand them over to the National Highway Authority after recovering their investment through toll collection.
What has been approved
The Public Private Partnership Authority’s board gave the go-ahead for the two sections at its 46th meeting, chaired by Prime Minister’s Adviser on Privatisation and Privatisation Commission Chairman Muhammad Ali.
The wider M-6 motorway is planned as a 306-kilometre, six-lane, access-controlled route divided into five sections. The new approval covers only part of that corridor, not the full motorway.
A key part of the financing plan is viability gap funding for the first section. That support from the government is meant to make the project easier to finance and keep toll charges more affordable for users. But the final toll schedule has not been announced yet.
For readers tracking the project’s slow progress, DrivePK has also covered the earlier uncertainty around its timeline in M-6 Motorway Delay Puts November 2026 Start in Doubt.
Why the motorway matters
The M-6 is often called the missing link in Pakistan’s north-south road network. Once built, it should give passenger traffic and freight carriers a faster path between Hyderabad and Sukkur, while also easing pressure on the busy N-5.
The N-5 route cuts through towns and populated areas, which can slow down traffic and add congestion. A motorway bypass should make journeys more predictable, especially for long-distance commuters, families, and transport companies moving goods.
The project is also expected to help cargo movement between Karachi’s ports, industrial areas, and markets in the north. That could matter for freight operators who face delays and fuel costs on the current highway network.
Financing and the next steps
The National Highway Authority will now invite bids from qualified local and foreign investors. The Asian Development Bank is acting as transaction adviser for both approved sections.
The remaining three sections, from Nawabshah to Sukkur, are being financed through loans from the OPEC Fund and the Islamic Development Bank. Those parts are still in the procurement stage, which means the full motorway is not operational yet.
That also means there are still several steps before any driver can use the finished route. Bids still need to be invited, bidders selected, financing closed, land and construction work managed, and then the sections built and opened.
The three-hour travel target should be seen as the expected result after completion, not a current promise. Delivery can still be affected by procurement, financing, land issues, construction delays, and coordination across the five sections.
For motorists and freight operators, the short-term impact is limited. The longer-term payoff, if the project stays on track, could be lower transport costs, quicker trips, and smoother movement between Sindh’s major cities and the rest of the country.
For more background on other motorway plans, see Pakistan Motorway Projects: PM Inauguration Soon.
Explore DrivePK services
Buying or selling a vehicle? Explore DrivePK services, including car inspection, Sell It For Me and Featured Listings, and choose the option that fits your needs.
For more updates, visit DrivePK.com
Tags
Share this article
About the Author

Dr Khan
Automotive Expert & Content Strategist
Comments (0)
Login Required
You need to be logged in to comment on this article.
No comments yet. Be the first to share your thoughts!
Related Articles

سندھ نے نمبر پلیٹس کے لیے 1.5 ارب روپے کی منظوری دے دی
سندھ نے نئی سیکیور گاڑیوں کی پلیٹس کے لیے 1.5 ارب روپے منظور کر لیے، جس سے تاخیر میں کمی آسکتی ہے—تاہم موٹرسائیکل سواروں اور ڈرائیورز کو فوری اجرا کی توقع نہیں رکھنی چاہیے۔

Sindh Approves Rs 1.5 Billion for Number Plates
Sindh approves Rs1.5bn for new secure vehicle plates, potentially easing delays—but motorists shouldn’t expect immediate issuance.

پاکستان میں 1,000cc کاروں کے لیے فیول سبسڈی زیرِ غور
ایندھن میں ریلیف 1,000cc تک کی کاروں تک بڑھ سکتا ہے، تاہم یہ تجویز ابھی حتمی نہیں۔ موجودہ امداد موٹرسائیکلوں، رکشوں اور 800cc تک کی کاروں کے لیے ہے۔