NHMP Repair Advisory for M-2, M-3 and M-4
Check motorway updates before travelling: repairs continue on M-2, M-3, M-4 and E-35, while the M-1 has reopened fully.

Table of Contents
- Where repair work is under way
- M-1 has reopened, but that does not clear every route
- What drivers should expect
- Why this advisory matters now
- Before you leave
Motorists planning a trip through the motorway network should check the latest route status before leaving, as repair work is still under way on several major stretches. According to source reports, the National Highways and Motorway Police has warned drivers about ongoing work on the M-2, M-3, M-4 and E-35, while also confirming that the M-1 between Islamabad and Peshawar has reopened in both directions.
That difference matters for travellers. A motorway may be open in one zone and still have lane closures, diversions or slow traffic in another. A quick check before departure can save time, fuel and stress, especially for families, bus operators and commercial drivers who cannot afford a long delay.
Where repair work is under way
According to a source report at http://cpo.nhmp.gov.pk:7892/TA/public/viewtravel.aspx, work is ongoing on the E-35 Burhan-Thakot section. The same report shows repair-related lane closures on the M-2 north and south zones, including the Islamabad-Kot Momin side and the Kot Momin-Lahore side.
The affected M-2 locations listed in source reports include:
- Akhoon di Bandi
- Balkasar
- Capital Smart City
- Neela Dulha
- Kallar Kahar
- Shadiwal
- Hadiyala Virkan
- Sheikhupura
- M-3 between Lahore and Abdul Hakeem
Repair work is also reported on:
- M-4 between Pindi Bhattian and Abdul Hakeem
- N-5 at different points in the north, central and south zones
lower speed limits
A separate source report at https://nhmp.gov.pk/Press_Releasesalso shows that NHMP has recently been active on road safety and enforcement, which is a reminder that officers are likely to be strict around work zones as well.
M-1 has reopened, but that does not clear every route
According to source reports, the M-1 between Islamabad and Peshawar has reopened to traffic in both directions. That is good news for drivers who rely on this route for travel between the capital and Khyber Pakhtunkhwa.
Still, the reopening of M-1 does not mean the rest of the motorway system is fully clear. Several other stretches remain affected by repair work, so drivers should not assume the whole network is running normally.
What drivers should expect
Near repair zones, motorists may face:
- lane closures
- temporary diversions
- merging traffic
- delays at busy points
Drivers should also watch for workers, barriers and uneven road surfaces. It is better to follow posted signs and NHMP staff than to rely only on a map app, since road conditions can change quickly.
Why this advisory matters now
According to source reports, the warning comes during a period of stronger traffic and security arrangements linked to a planned Islamabad march. The march was said to be postponed from September 27 to October 4, but road users are still being urged to stay alert and follow official updates.
For people travelling to or from Islamabad, Lahore and Peshawar, the safest plan is to leave extra time, confirm the route before starting, and avoid entering a closed lane just to save a few minutes.
Before you leave
A simple travel check can help:
- confirm the latest NHMP update
- check your exact entry and exit points
- keep extra travel time in hand
- carry ID, a charged phone and emergency contacts
- drive slowly through work zones
For Islamabad drivers, this related traffic advisory may also help if your trip passes through the city.
For now, the key point is simple: M-1 is open, but repairs are still active on several major motorway and highway sections. Check updates again right before travel and drive with extra care.
For more updates, visit DrivePK.com
Tags
Share this article
About the Author

Dr Khan
Automotive Expert & Content Strategist
Comments (0)
Login Required
You need to be logged in to comment on this article.
No comments yet. Be the first to share your thoughts!
Related Articles

Rawalpindi Ring Road Opening Delayed by Toll Plaza Work
Rawalpindi Ring Road is structurally complete, but toll plazas and e-toll systems remain unfinished—delaying opening, toll rates and traffic relief.

Islamabad Blockades Delay Karachi Freight Before PTI Protest
PTI’s Oct. 4 march may delay northbound freight from Karachi, affecting car parts, tyres and workshop supplies—but the scale remains unclear.

Oil Prices Near $100: Impact on Pakistan
Brent nears $100 after a sharp swing linked to China’s fuel-export curbs—but Pakistan’s petrol and diesel prices remain unchanged for now.