News and tips 3 min read4 months ago

Thatta Cement Steps into Agri-Tech: BELARUS Tractor Assembly Coming to Balochistan

Thatta Cement Company Limited is stepping into agriculture through its subsidiary MWTA, signing a deal with OJSC Minsk Tractor Works to assemble BELARUS tractors in Balochistan. The move promises job growth, skill development, and affordable machinery for local farmers, marking a bold industrial shift for Pakistan’s agriculture sector.

By Najeeb KhanOct 21, 2025 312 views 0 comments
Thatta Cement Steps into Agri-Tech: BELARUS Tractor Assembly Coming to Balochistan

Table of Contents

  • Why This Deal Changes Things
  • Jobs and Growth on the Ground
  • The Bigger Picture for Pakistan

Thatta Cement Company Limited just made a bold step away from its core business. Through its subsidiary, Minsk Work Tractor & Assembling (Private) Limited or MWTA for short they've inked an exclusive deal with OJSC Minsk Tractor Works from Belarus. The plan? Build and roll out BELARUS tractors right here in Balochistan. It's a quiet shift that's set to shake up local farming in ways that matter.

Why This Deal Changes Things

Picture this: Balochistan's vast fields, often held back by pricey imports from far-off places. Now, MWTA gets the green light to assemble these sturdy machines on home soil. And not just build them they hold the sole rights to sell them across the province. Farmers get tough, affordable tractors built nearby, cutting down on shipping costs and wait times. No more betting everything on foreign gear that breaks the bank.

But it goes deeper than that. This setup pushes for real know-how sharing. Belarusian experts will train local teams, sparking a wave of skills that stick around. Over time, it means fewer headaches with maintenance and more confidence in handling the tools that feed a nation.

Jobs and Growth on the Ground

Here's where it hits close to home. Assembling tractors isn't just about bolts and engines, it's about people. This project will create steady jobs in Balochistan, from factory floors to sales desks. Young folks get a shot at real work, building something lasting. And as production ramps up, the ripple spreads: suppliers, repair shops, even nearby markets see a boost.

Thatta Cement isn't new to big ideas, but this feels different. They've long been in the cement game, mixing up foundations for roads and homes. Now, they're planting roots in agriculture. It fits their push to grow smarter, tapping into Pakistan's need for stronger farms. Balochistan, with its wide-open spaces, steps up as the spot for this to take off.

The Bigger Picture for Pakistan

Agriculture powers so much of our economy, yet it's starved for reliable tools. Imported tractors drain wallets and delay harvests. This move flips that script. Local builds mean quicker fixes, lower prices, and gear tuned to tough terrain. Farmers work smarter, yields climb, and food gets to tables fresher.

It's a win for self-reliance too. Less dependence on outsiders for essentials. Thatta Cement's play here shows how one company can lift a whole sector. Balochistan gains an edge, drawing eyes from investors who see potential in its dirt roads turning to highways of progress.

In the end, this isn't flashy news. It's the kind of steady work that builds futures, one tractor at a time. If you're in farming or just rooting for local wins, keep an eye on Balochistan. Something good is revving up. For more updates visit DrivePK.com

Tags

thatta cement belarus tractors mwta pakistan minsk tractor works tractor manufacturing balochistan agriculture pakistan farming news local tractor production agriculture pakistan industrial growth balochistan tractor assembly plant tractor industry pakistan thatta cement mwta agriculture machinery pakistan tractor news local job creation pak belarus collaboration tractor plant pakistan pakistan economic growth drivepk business news

Share this article

About the Author

N

Najeeb Khan

Automotive enthusiast and writer

Comments (0)

Login Required

You need to be logged in to comment on this article.

No comments yet. Be the first to share your thoughts!

Related Articles

Karachi Red Line BRT Project Update 2026: Sharjeel Inam Memon Shares Timeline and Challenges

Karachi Red Line BRT Project Update 2026: Sharjeel Inam Memon Shares Timeline and Challenges

Sharjeel Inam Memon updated on the Red Line BRT in Karachi. The project could need another 18 months to complete after facing big challenges. Side roads will be ready before Eid. Key work on University Road finishes soon. Efforts continue to clear bus import hurdles

4 min readFeb 24, 2026
Islamabad Electric Tram Service 2026: CDA Starts Feasibility Study for New Routes

Islamabad Electric Tram Service 2026: CDA Starts Feasibility Study for New Routes

Capital Development Authority has begun work on an electric tram service in Islamabad. The move follows direct orders from the federal interior minister. The feasibility study must finish in three months. Routes planned from Islamabad Airport and Rawat to Lake View Park. The system will be fully cashless.

4 min readFeb 24, 2026
Thalian Interchange Work Starts Next Week on Rawalpindi Ring Road,  Cost Now Rs 47 Billion

Thalian Interchange Work Starts Next Week on Rawalpindi Ring Road, Cost Now Rs 47 Billion

Work on the Rs 5 billion Thalian Interchange of the Rawalpindi Ring Road starts next week. The divisional administration will acquire 358 extra kanals near the motorway, raising the total project cost to Rs 47 billion. More than 85% of the road is already finished. Bookings for toll and e-tags are expected to follow the Lahore model at Rs 80 per vehicle.

4 min readFeb 24, 2026
DrivePk

Connect With Us

Help us improve our website

Download on App StoreGet it on Google PlayDownload from Huawei AppGallery
Copyright © DrivePk 2025.

Copyright © DrivePk 2025. All rights reserved.