Attock Road Projects: 59 Schemes Worth Rs. 23 Billion
Maryam Nawaz reportedly launched 59 Attock road projects worth Rs23bn, promising better travel—though costs and timelines remain unclear.

Table of Contents
- What is included in Attock’s road package?
- What will the work mean for daily travel?
- Why the drainage plan matters
- What’s still missing for motorists?
- Conclusion
- Explore DrivePK services
Punjab Chief Minister Maryam Nawaz has reportedly launched 59 road projects worth Rs. 23 billion in Attock, with the package said to sit within 127 development schemes for the district. For families, students, workers, and commercial drivers, that sounds like welcome news, but the public details still don’t give a full road-wise list, project budgets, or timelines yet, according to media reports and the available reporting from a source report and Dawn.
What is included in Attock’s road package?
Reportedly, the reported package covers 59 road schemes worth Rs. 23 billion, along with a wider set of 127 development schemes in Attock. The report also says around 850 kilometres of roads were part of the broader district programme, but it does not make clear whether that figure means completed roads, active work, or approved plans. For background, read our earlier coverage: Punjab Govt to Buy 108 New Vehicles Worth Rs 1.14 Billion in 2026 – Full Details.
Three roads were specifically named in the reporting:
- Fatehjang-Pindigheb Road
- Dhoke Laham-Jhamat Road
- Mithial Chowk-Dhoke Pathan Road
- block traffic during heavy rain
That is important, because these are the only road names we can point to with any confidence right now. They are not a full list of the 59 schemes. For background, read our earlier coverage: Punjab Probes Rawalpindi Ring Road Design Changes.
If you want a sense of how road projects can affect travel in this part of Punjab, our earlier coverage of Attock Bridge and M-1 reopening shows why local route updates matter so much for daily commuters.
What will the work mean for daily travel?
If these road schemes move ahead as reported, the biggest benefit should be more reliable travel. Better surfaces and repaired links could help people move between Attock, Pindigheb, Fateh Jang, and nearby rural areas with less stress.
That matters for real life, not just development headlines. Students need predictable school runs. Shopkeepers and traders need goods to move on time. Ambulances, buses, and pickup vans all suffer when roads break up or flood after rain.
But there’s another side too. Construction usually means slow traffic, uneven surfaces, and possible diversions before the final improvement arrives. So yes, better roads could help — but not without some short-term pain first.
Why the drainage plan matters
The report also says drainage work is planned in Attock city to reduce rainwater accumulation. That may sound like a small side note, but it’s a big deal for local roads.
Standing water can:
- damage road surfaces faster
- make motorcycle and pedestrian travel risky
- create messy, longer delays at low-lying crossings
- project-wise maps and route limits
So if the drainage work is handled properly, it could protect the new roads too. Still, the announcement does not give the drainage budget, exact locations, or completion date, so the full scope is still unclear.
What’s still missing for motorists?
Right now, residents still need the basics before they can judge the real impact of this package:
- individual budgets
- contractor or agency details
- start and completion dates
- traffic diversion plans
- progress updates for each road
Until those details are published, drivers should treat the announcement as a development update, not a sign that all work is complete or open for normal traffic.
If you’re planning a trip through these routes, check local traffic and district administration updates first. That’s the safest move, especially if construction starts in phases.
Conclusion
According to media reports, Attock’s road package covers 59 schemes worth Rs. 23 billion, with the three named roads being Fatehjang-Pindigheb Road, Dhoke Laham-Jhamat Road, and Mithial Chowk-Dhoke Pathan Road. The wider plan could make travel safer and more dependable for local residents, but the missing details on budgets, timelines, and traffic management mean motorists should still expect possible disruption before the benefits show up.
Explore DrivePK services
Buying or selling a vehicle? Explore DrivePK services, including car inspection, Sell It For Me and Featured Listings, and choose the option that fits your needs.
For more updates, visit DrivePK.com
Tags
Share this article
About the Author

Dr Khan
Automotive Expert & Content Strategist
Comments (0)
Login Required
You need to be logged in to comment on this article.
No comments yet. Be the first to share your thoughts!
Related Articles

پاکستان آٹو پالیسی 2026-31 میں $6bn برآمدی ہدف مقرر
پاکستان کی آٹو پالیسی 2026-31 کا ہدف $6bn برآمدات ہے، تاہم مجوزہ قیمت، بکنگ اور انجن لیویز کو ابھی کابینہ کی منظوری درکار ہے۔

Pakistan Auto Policy 2026-31 Sets $6bn Export Target
Pakistan’s Auto Policy 2026-31 targets $6bn in exports, but proposed price, booking and engine levies await cabinet approval.

پاکستان نے 45 نئی گاڑیوں کی حفاظتی معیارات شامل کر دیے
پاکستان نے اقوامِ متحدہ کے قواعد سے منسلک 45 نئے وہیکل سیفٹی اسٹینڈرڈز کا اعلان کیا ہے، تاہم نفاذ کی تاریخ اور متاثرہ گاڑیوں کی اقسام ابھی واضح نہیں۔