News and tips 4 min read2 hours ago

Karachi Link Road Work Halted Over KCR Land Dispute

Karachi’s Natha Khan Link Road promised faster commutes, but a land dispute between KMC and Pakistan Railways now clouds its opening.

By Dr KhanOct 19, 2026 9 views 0 comments
Karachi Link Road Work Halted Over KCR Land Dispute

Table of Contents

  • Why has work on the link road become uncertain?
  • What did the earlier opening report say?
  • Which Karachi routes may feel the impact?
  • Why does the Karachi Circular Railway corridor matter here?
  • What should motorists do right now?
  • Conclusion
  • Explore DrivePK services

Karachi’s Natha Khan Link Road was expected to give drivers a faster way between Gulistan-e-Jauhar and Shahrah-e-Faisal, but that relief now looks uncertain. A later report says the project has run into a land dispute between Karachi Metropolitan Corporation and Pakistan Railways, while an October 13 report had earlier said the road would open soon, without naming a firm date. October 19 report | October 13 report

The reported problem is simple on the surface, but messy underneath. The later report says the disputed land is near Natha Khan Bridge, Pehlwan Goth, and the Habib University area, and that Pakistan Railways objects to construction there because it says the land is part of the Karachi Circular Railway corridor. October 19 report For background, read our earlier coverage: Karachi's Rs 4.2 Billion Road Upgrade Plan: Fixing Traffic and Sewerage in 2026.

That matters because the road was meant to give Karachi drivers another connection between Gulistan-e-Jauhar and Shahrah-e-Faisal. If the agencies cannot agree on the land, the project can’t move ahead in a clean way. But the available reporting does not confirm a final legal decision, a formal stop order, or a revised construction plan. For background, read our earlier coverage: Karachi Red Line BRT Flyover Opens on University Road.

And that’s the part commuters need to watch. A road can be talked about as “soon” one day and then face a fresh hurdle the next.

What did the earlier opening report say?

On October 13, 2026, one report said Karachi Mayor Murtaza Wahab expected the Natha Khan Link Road to open soon. It did not give a specific opening date. October 13 report

So for readers, the timeline has changed from hopeful to uncertain. That does not mean the project is cancelled. It just means you should not plan your daily route around an opening that has not been confirmed again after the land dispute report.

Which Karachi routes may feel the impact?

Even without an official traffic advisory, the practical pressure is easy to see. If you travel around:

  • Gulistan-e-Jauhar

  • Natha Khan

  • Pehlwan Goth

  • Shahrah-e-Faisal

  • Jauhar Mor

  • Rashid Minhas Road
  • you already know how tight traffic can get at busy hours.

    The planned link road was supposed to ease that movement by creating another option. Until there is a clear update, motorists should keep using the routes they already trust and build in extra time, especially during office hours and school runs. Don’t assume the new link will save time just because an earlier report said it was nearing opening.

    Why does the Karachi Circular Railway corridor matter here?

    This dispute is not really about one road alone. It also touches the old Karachi Circular Railway alignment, which Pakistan Railways says the affected land belongs to, according to the later report. That makes the issue bigger than a normal roadwork delay, because any overlap with railway land usually needs clear coordination between agencies first. October 19 report

    What we still don’t know is just as important:

  • the exact disputed strip of land

  • what record or map each side is relying on

  • whether written clearance exists

  • whether any part of the road work is still moving elsewhere on the route

Until one of those points is answered officially, the safest reading is that the project’s timing is unsettled.

What should motorists do right now?

For now, don’t plan your commute around the Natha Khan Link Road opening.

Use existing routes between Gulistan-e-Jauhar and Shahrah-e-Faisal, and allow extra time near Natha Khan Bridge, Jauhar Mor, and Rashid Minhas Road. If you need to change your daily route, wait for a clear announcement from Karachi Metropolitan Corporation or Pakistan Railways before treating the road as open.

That’s the real reader impact here: not a finished road, but a delay in the shortcut many Karachi drivers were hoping for.

Conclusion

The Natha Khan Link Road still matters because it could improve travel between Gulistan-e-Jauhar and Shahrah-e-Faisal, but its opening is now uncertain after the reported Pakistan Railways-KMC land dispute. For Karachi commuters, the smart move is to keep using current routes, expect congestion near Natha Khan and nearby roads, and wait for an official update before relying on the new link.

Explore DrivePK services

Buying or selling a vehicle? Explore DrivePK services, including car inspection, Sell It For Me and Featured Listings, and choose the option that fits your needs.

For more updates, visit DrivePK.com

Tags

Karachi link road Natha Khan Link Road Karachi Circular Railway

Share this article

About the Author

Dr Khan

Dr Khan

Automotive Expert & Content Strategist

Comments (0)

Login Required

You need to be logged in to comment on this article.

No comments yet. Be the first to share your thoughts!

Related Articles

DrivePK Sell It For Me: Let Us Handle Your Car Sale

DrivePK Sell It For Me: Let Us Handle Your Car Sale

Selling your car in Pakistan is time-consuming. Before using DrivePK’s Sell It For Me, verify its process, fees, and handover rules first.

5 min readOct 19, 2026
33 Karachi Traffic Signals Fail Amid Cable Theft

33 Karachi Traffic Signals Fail Amid Cable Theft

Karachi’s traffic chaos deepens: a report says 33 of 94 signals are down, with cable theft blamed—though the figures remain unverified.

4 min readOct 19, 2026