News and tips 4 min read5 days ago

Lahore-Sahiwal-Bahawalnagar Motorway: 295km Plan

Proposed 313km Lahore-Sahiwal-Bahawalnagar motorway could transform Punjab travel and freight—but it isn’t built yet.

By Dr KhanNov 16, 2026 131 views 0 comments
Lahore-Sahiwal-Bahawalnagar Motorway: 295km Plan

Table of Contents

  • A major corridor for Punjab’s road network
  • Cost has moved up sharply
  • What this means for residents and businesses
  • Not a done deal yet
  • Explore DrivePK services

The federal government has again highlighted the planned Lahore-Sahiwal-Bahawalnagar Motorway, a project that could one day give central and southern Punjab a faster road link to Lahore. For now, though, it remains a proposed corridor, not an operating motorway.

The plan covers a 295km main route and an extra 18km connecting road from Lahore Ring Road through Raja Jang Interchange to Kasur. If it moves ahead, the project could matter for daily commuters, farmers, and freight operators who depend on road links between Lahore and the districts of Kasur, Okara, Pakpattan, Sahiwal and Bahawalnagar.

A major corridor for Punjab’s road network

The proposed motorway is meant to pass through or serve several of Punjab’s key agricultural and population centres. That is why it has drawn attention again under the federal government’s URAAN Pakistan framework, where it is placed under the Energy and Infrastructure pillar.

For local travellers, the main promise is simpler road access. For farmers and traders, the bigger value may be smoother movement of crops, livestock-related goods, and commercial freight toward Lahore and other markets. The route could also help intercity buses and private vehicles if the project is completed with proper interchanges and service roads.

But that benefit is still conditional. No confirmed opening date, construction start date, or final operating map has been made public in the available material.

Cost has moved up sharply

The project was originally approved in July 2023 at about Rs. 263.795 billion. In official project records, the National Highway Authority had recommended the 295km scheme at that figure, with land acquisition assigned to the Punjab government.

More recent development documents show a much higher number. A January 2026 update listed the revised project cost at about Rs. 465.17 billion. That means the estimate has risen by more than Rs. 200 billion from the original approval.

The revised figure should be treated as a later estimate, not a final bill already paid by motorists. It also does not mean toll rates are set. Those details are not confirmed in the available records.

What this means for residents and businesses

For families travelling between Lahore and southern Punjab, a controlled-access motorway could make trips more predictable once it is actually built. For businesses, especially those moving agricultural produce, the route could offer a better link to Lahore’s markets and distribution points.

Still, the real impact will depend on several things:

  • completion of land acquisition

  • approval of the revised PC-I

  • funding and tendering

  • contractor appointment

  • construction progress

  • final interchange and access-road design

Without those steps, the project stays a plan on paper.

Not a done deal yet

The motorway continues to appear in federal development discussions, and the revised scheme has been reported as moving through the approval process. That is important, but it is not the same as construction start or public opening.

Residents, transport firms and landowners should wait for formal updates from the NHA, Planning Commission, ECNEC and the Punjab government before treating the route as a finished project. Cost changes and delays can still happen.

For background on similar motorway planning in Punjab, see Lahore-Sialkot-Kharian Motorway to Reach Rawalpindi and Pakistan New Motorway Link: Lahore-Sialkot to Islamabad Via Kharian Cuts 100km Travel.

The Lahore-Sahiwal-Bahawalnagar Motorway could become an important road for passenger travel and freight movement across Punjab, but for now it remains a planned and evolving project, not an open one.

Explore DrivePK services

Buying or selling a vehicle? Explore DrivePK services, including car inspection, Sell It For Me and Featured Listings, and choose the option that fits your needs.

For more updates, visit DrivePK.com

Tags

Lahore Sahiwal Bahawalnagar Motorway 295km motorway Pakistan Punjab motorway projects

Share this article

About the Author

Dr Khan

Dr Khan

Automotive Expert & Content Strategist

Comments (0)

Login Required

You need to be logged in to comment on this article.

No comments yet. Be the first to share your thoughts!

Related Articles

سندھ نے نمبر پلیٹس کے لیے 1.5 ارب روپے کی منظوری دے دی

سندھ نے نمبر پلیٹس کے لیے 1.5 ارب روپے کی منظوری دے دی

سندھ نے نئی سیکیور گاڑیوں کی پلیٹس کے لیے 1.5 ارب روپے منظور کر لیے، جس سے تاخیر میں کمی آسکتی ہے—تاہم موٹرسائیکل سواروں اور ڈرائیورز کو فوری اجرا کی توقع نہیں رکھنی چاہیے۔

3 min readNov 21, 2026
Sindh Approves Rs 1.5 Billion for Number Plates

Sindh Approves Rs 1.5 Billion for Number Plates

Sindh approves Rs1.5bn for new secure vehicle plates, potentially easing delays—but motorists shouldn’t expect immediate issuance.

3 min readNov 21, 2026
پاکستان میں 1,000cc کاروں کے لیے فیول سبسڈی زیرِ غور

پاکستان میں 1,000cc کاروں کے لیے فیول سبسڈی زیرِ غور

ایندھن میں ریلیف 1,000cc تک کی کاروں تک بڑھ سکتا ہے، تاہم یہ تجویز ابھی حتمی نہیں۔ موجودہ امداد موٹرسائیکلوں، رکشوں اور 800cc تک کی کاروں کے لیے ہے۔

4 min readNov 21, 2026