NHA to Build 1.56km Malupa Tunnel in GB
A 1.56km Malupa Tunnel is planned on Gilgit-Baltistan’s Jaglot-Skardu Road, promising safer travel—but costs and timelines remain unknown.

On November 25, 2026, Federal Minister for Communications Abdul Aleem Khan announced a planned 1.56-kilometre Malupa Tunnel on the Jaglot-Skardu Road in Gilgit-Baltistan. The reported project is meant to give travelers a safer passage through a stretch that faces landslide risk and harsh mountain weather, but no official project cost, construction start date, completion date, or opening date has been shared yet.
What is confirmed about the Malupa Tunnel plan?
The announcement says the National Highway Authority will handle the project. The reported tunnel length is 1.56 kilometres, and the width is 10.8 metres, with two-way traffic and shoulders on both sides. For background, read our earlier coverage: New MNJC Motorway Approved: 172km Safe Route from Mansehra to Chilas with Pakistan’s Longest Tunnel.
That matters because it suggests a proper road tunnel, not a narrow emergency cut-through. For drivers heading towards Skardu, that usually means a more controlled section of road at one of the more difficult points on the route. For background, read our earlier coverage: NHA Raises M2 Toll Rates by 7% What It Means for You.
But one thing is still clear: this is an announced plan, not a confirmed finished project. No official NHA document in the available material gives us the contractor, budget, timeline, or opening date.
If you want a broader look at how NHA road projects can affect travel and costs, our earlier coverage on New MNJC Motorway Approved: 172km Safe Route from Mansehra to Chilas with Pakistan’s Longest Tunnel gives useful background on major northern road work.
Why does this tunnel matter for travelers?
Anyone who has driven in Gilgit-Baltistan knows the problem. Mountain roads can turn unsafe fast when rain, falling rocks, or landslides hit exposed stretches. A tunnel can help by taking traffic through a protected section instead of forcing vehicles to pass along a risky slope.
That does not mean the whole Jaglot-Skardu Road will become trouble-free. Landslides can still affect the approaches to the tunnel, and weather can still disrupt travel elsewhere on the route. So the safest way to read this announcement is simple: it’s a promise of improvement, not a guarantee that every hazard will disappear.
For families, tourists, and local commuters, the real value would be less exposure to danger at the Malupa section if the project is built well and maintained properly. That also depends on drainage, lighting, ventilation, and rescue planning, but those technical details have not been announced yet.
What else was said about road safety?
Alongside the tunnel plan, the reported announcement also mentioned wider safety steps for the area. These include overhead protective sheds at Malupa and Barundonala, plus directions to install road lighting, set up rescue services, and improve patrolling.
That’s an important detail, because protective sheds are not the same thing as a tunnel. They are separate safety works meant to help guard traffic from rockfall or weather-related danger at exposed points. Barundonala is part of the wider safety discussion here, not the site of another tunnel.
The big question now is whether these safety ideas move from announcement to active work. For now, the only firm point is that they were part of the minister’s reported directions.
What is still unconfirmed?
A lot, and that’s why readers should stay careful before assuming the route is already getting safer.
- Project cost
- Funding arrangement
- Contractor or executing firm
- Construction start date
- Completion date
- Opening date
- Final design details
- Lighting and ventilation setup
- Drainage and emergency exit plans
- Construction-phase traffic handling
- Whether the road will stay fully open during work
Until an official NHA or government update gives those details, it’s best to treat this as a planned project.
What should travelers do now?
If you use the Jaglot-Skardu Road, keep checking official road-condition updates before you leave. Don’t assume the tunnel will be ready soon, and don’t plan a trip around an unconfirmed opening date.
That’s especially important in bad weather. On this kind of mountain route, a small delay can turn into a long wait if landslides block the road or rescue crews need time to clear the area.
Conclusion
The reported Malupa Tunnel plan is a meaningful step for road safety on the Jaglot-Skardu Road, especially in a landslide-prone stretch of Gilgit-Baltistan. But the real test will be delivery, and right now the key project details like cost, timing, and opening date are still unconfirmed.
Explore DrivePK services
Buying or selling a vehicle? Explore DrivePK services, including car inspection, Sell It For Me and Featured Listings, and choose the option that fits your needs.
For more updates, visit DrivePK.com
Share this article
About the author

Dr Khan
Automotive expert and content strategist



Comments (0)
Sign in required
Sign in to comment on this article.
No comments yet. Be the first to share your thoughts!