News and tips 3 min read16 hours ago

Rawalpindi Ring Road Delay Reaches Ninth Postponement

Rawalpindi Ring Road’s inauguration is delayed for ninth time. Traffic may open first, but unfinished interchanges, tolls and weighing stations remain.

By Dr KhanNov 14, 2026 18 views 0 comments
Rawalpindi Ring Road Delay Reaches Ninth Postponement

Table of Contents

  • Explore DrivePK services

The Rawalpindi Ring Road inauguration has been postponed for the ninth time, and officials have not announced a new public ceremony date. The latest plan is to give only 24 hours’ notice before the inauguration event, while the road may open to general traffic even before that formal ceremony.

That means commuters should not treat the next ceremony announcement as proof that the full project is ready for normal use. The opening of traffic and the inauguration event are now being handled as separate steps.

The delay also shows that the project is still not fully finished. One interchange is still incomplete, and contractors must also complete the toll plazas, toll booths, computerized toll collection system, and weighing stations. The Rawalpindi Ring Road Authority has asked contractors to finish the remaining interchange and toll-related work by the end of this month.

For drivers in Rawalpindi and nearby Islamabad routes, the repeated delays matter because the ring road was meant to cut through traffic and reduce pressure on city roads. Many commuters have been waiting for a faster link around the city, especially for daily travel and heavy traffic movement. But until the road is fully ready, there may still be limited access, temporary traffic control, or delayed toll enforcement if any section opens early.

The project’s long wait is also adding to its cost. The estimated expense had already climbed to Rs. 51.32 billion, and it crossed Rs. 52 billion again this week. While the source does not give a full breakdown for the rise, the repeated delays are part of the wider financial strain on the project. The work has now stretched over 24 years.

Former prime minister Imran Khan laid the foundation stone in March 2022, but the project has continued to face missed deadlines and criticism. Officials who announced inauguration dates while construction was still incomplete have already faced strong reprimands, and they have since stopped commenting publicly on the matter.

For now, the most important thing for motorists is to wait for a proper traffic notice, not just a ceremony update. Before using the road, drivers should look for confirmation on route access, interchange readiness, toll arrangements, and any safety or traffic rules that may apply during the opening phase. Keeping an alternate route ready would still be the safer choice until the authority gives a clear traffic-opening announcement.

Readers following the project’s earlier timeline can also check our background coverage on Rawalpindi Ring Road Opening Delayed by Toll Plaza Work and Rawalpindi Ring Road 90% Complete, Latest Progress and Expected Opening Date.

For now, the ninth postponement points to unfinished construction, not a confirmed cancellation. The key update commuters need is still the same: when the road is ready for traffic, not when the ribbon-cutting will happen.

Explore DrivePK services

Buying or selling a vehicle? Explore DrivePK services, including car inspection, Sell It For Me and Featured Listings, and choose the option that fits your needs.

For more updates, visit DrivePK.com

Tags

Rawalpindi Ring Road Rawalpindi Ring Road inauguration Pakistan road projects

Share this article

About the Author

Dr Khan

Dr Khan

Automotive Expert & Content Strategist

Comments (0)

Login Required

You need to be logged in to comment on this article.

No comments yet. Be the first to share your thoughts!

Related Articles

کے پی کا سرمائی روڈ پلان 8 بلند خطرہ اضلاع کو ہدف بناتا ہے

کے پی کا سرمائی روڈ پلان 8 بلند خطرہ اضلاع کو ہدف بناتا ہے

سخت سردیوں کے پیش نظر کے پی نے عملہ، ایندھن اور مشینری تیار رکھنے کے احکامات جاری کر دیے ہیں، کیونکہ برفباری، لینڈ سلائیڈز اور برفانی تودے آٹھ بلند خطرہ اضلاع میں سڑکوں کو متاثر کر سکتے ہیں۔

3 min readNov 14, 2026
KP Winter Road Plan Targets 8 High-Risk Districts

KP Winter Road Plan Targets 8 High-Risk Districts

With harsh winter ahead, KP orders crews, fuel and machinery ready as snow, landslides and avalanches threaten roads in eight high-risk districts.

3 min readNov 14, 2026
پاکستان میں درآمد شدہ گاڑیوں پر ایک سالہ ٹرانسفر چیک مزید سخت

پاکستان میں درآمد شدہ گاڑیوں پر ایک سالہ ٹرانسفر چیک مزید سخت

پاکستان نے گفٹ اور بیرونِ ملک سے درآمد شدہ گاڑیوں کی جانچ سخت کر دی ہے اور قبل از وقت فروخت روکنے کے لیے ایک سالہ ٹرانسفر پابندی نافذ کی جا رہی ہے—یہ کوئی نئی امپورٹ پابندی نہیں۔

3 min readNov 14, 2026