Toyota Doubles Down on US Roots with Fresh $10 Billion Bet
Toyota will invest an additional $10 billion in the US over five years and has opened its massive $13.9B battery plant in North Carolina, creating 5,100 jobs and boosting EV and hybrid production across America.

Table of Contents
- A Battery Plant That Powers the Future
- Trump's Hint Turns Real
- Profits Hold Strong Amid the Noise
- Why It Sticks
- The Road Ahead
Toyota has deep ties to America. For nearly 70 years, the company has built factories, hired workers, and shaped roads here. Now, it's adding fuel to that fire. On November 12, 2025, Toyota confirmed plans for up to $10 billion more in US investments over the next five years. That pushes its total spending in the country past $60 billion. It's a quiet nod to steady growth, even as trade winds shift.
A Battery Plant That Powers the Future
The news landed alongside a milestone: Toyota's first US lithium-ion battery plant swung into full production. Located in Liberty, North Carolina, this $13.9 billion site spans 1,850 acres and will crank out 30 gigawatt-hours of batteries a year. Those cells will juice up hybrids like the Camry, RAV4, and Corolla Cross, plus plug-ins and a coming all-electric three-row SUV.
Up to 5,100 jobs come with it, good news for local families and the economy. Production started shipping modules to Kentucky and Alabama plants back in June. But the official opening? That's this week, a sign Toyota's all-in on electrified rides without chasing every EV hype.
Trump's Hint Turns Real
This isn't out of nowhere. Last month, during a swing through Asia, President Donald Trump spotlighted the $10 billion figure. He tied it to talks with Toyota execs and Japan's prime minister, urging folks to "go out and buy a Toyota." At first, Toyota downplayed it, no firm promise, just ongoing plans. Now, they've locked it in, calling it a "pivotal moment."
It fits a bigger US-Japan deal from July. Japan pledged $550 billion in investments and loans for things like supply chains in pharma and chips. In return? Auto tariffs drop to 15% from a threatened 25-27.5%. Still, pressure's on: Toyota may need to ship more US-made cars back home.
Profits Hold Strong Amid the Noise
Tariffs sting—Toyota now pegs a $9.4 billion hit this year. North America's business even dipped into the red for the first half. But the company's not flinching. It just bumped its full-year profit forecast to 3.4 trillion yen, about $22.6 billion, up 6% from before. A weaker yen, higher sales volumes, and cost cuts help.
Global output hit nearly 5 million vehicles in the first half, with double-digit jumps in the US. Hybrids lead the charge, proving Toyota's bet on practical electrification pays off.
Why It Sticks
These moves aren't flashy. They're about roots and resilience. The battery plant secures supply chains, dodging global glitches. Jobs in North Carolina mean real paychecks, not headlines. And amid tariff talks, Toyota's showing it can adapt, exporting US-built builds to Japan, ramping EVs here.
But questions linger. Will the $10 billion cover new plants or tweaks to old ones? How deep will tariffs cut if deals sour? For workers and drivers, it's a win: more options, steadier pay. For Toyota, it's proof that a 70-year US story still has chapters left.
The Road Ahead
Watch for details on that cash rollout. Toyota's eyeing 9.8 million vehicle sales next fiscal year. With hybrids humming and EVs on deck, they're set to keep leading. In a world of trade tugs and tech shifts, this feels like smart steering, not a sharp turn. For more updates, visit DrivePK.com
Tags
Share this article
About the Author
Najeeb Khan
Automotive enthusiast and writer
Comments (0)
Login Required
You need to be logged in to comment on this article.
No comments yet. Be the first to share your thoughts!
Related Articles

Karachi Red Line BRT Project Update 2026: Sharjeel Inam Memon Shares Timeline and Challenges
Sharjeel Inam Memon updated on the Red Line BRT in Karachi. The project could need another 18 months to complete after facing big challenges. Side roads will be ready before Eid. Key work on University Road finishes soon. Efforts continue to clear bus import hurdles

Islamabad Electric Tram Service 2026: CDA Starts Feasibility Study for New Routes
Capital Development Authority has begun work on an electric tram service in Islamabad. The move follows direct orders from the federal interior minister. The feasibility study must finish in three months. Routes planned from Islamabad Airport and Rawat to Lake View Park. The system will be fully cashless.

Thalian Interchange Work Starts Next Week on Rawalpindi Ring Road, Cost Now Rs 47 Billion
Work on the Rs 5 billion Thalian Interchange of the Rawalpindi Ring Road starts next week. The divisional administration will acquire 358 extra kanals near the motorway, raising the total project cost to Rs 47 billion. More than 85% of the road is already finished. Bookings for toll and e-tags are expected to follow the Lahore model at Rs 80 per vehicle.