Baltistan Highway Safety Measures Ordered Amid Landslides
Gilgit-Baltistan orders urgent safety measures on the Baltistan Highway after landslides disrupt travel, tourism and goods along the key Skardu link.

Table of Contents
- Why this matters for travelers and residents
- What the government wants changed
- What road users should do now
- Explore DrivePK services
The Gilgit-Baltistan government has asked the National Highway Authority and Frontier Works Organization to take emergency safety steps on the Baltistan Highway after repeated landslides and traffic problems, according to a source report from The road is a key link between the Karakoram Highway and Skardu, so any disruption can affect daily travel, tourism, and the movement of goods.
The issue came up in a meeting on road-accident and landslide prevention, where Chief Minister Amjad Hussain is said to have pressed for stronger safety arrangements without delay. The route, also called the Baltistan Road and Jaglot–Skardu Road, is described by the Frontier Works Organization as being about 164 kilometres long.
Why this matters for travelers and residents
For people in Skardu and nearby districts, this highway is not just a scenic route for tourists. It is also a supply line for fuel, food, medicines, and other basic items. When the road closes, local markets can feel the impact quickly, and families can be left waiting for passenger transport and essential deliveries.
The concern is not limited to one recent incident. According to the same source report, landslides blocked the road near Maloopa in Roundu in June, and later flash floods damaged a bridge near Sassi Haramosh in July. Heavy machinery from the National Highway Authority was used to clear debris and reopen access, while temporary bridge arrangements helped restore traffic.
That pattern shows the real problem: the route is often reopened after damage, but reopening does not mean the danger has gone away. Heavy rain, fast snow or glacier melt, and glacial movement can all create fresh risks on mountain roads, especially in narrow valleys and near unstable slopes.
What the government wants changed
The latest move is best seen as a prevention push, not a completed upgrade. The source report does not mention a budget, engineering plan, or deadline. It also does not confirm any new barrier system, drainage project, or traffic-control order.
Still, the message from the GB government is clear: the focus should move beyond clearing debris after a crash or landslide. Safer travel on the Baltistan Highway will likely need better hazard monitoring, stronger slope protection, and faster emergency response when weather turns bad.
That matters because this road serves not only local traffic but also visitors heading toward Skardu. For tourists, delays can mean missed bookings and longer, less predictable journeys. For residents, they can mean lost working hours and trouble getting supplies.
What road users should do now
Drivers should check live road conditions before leaving, especially after rain, snowfall, or signs of flooding. An old reopening notice should not be treated as proof that the road is safe today.
It is also wise to allow extra travel time and keep water, medicines, phone power, and other basic emergency items in the vehicle. Travelers should avoid stopping near loose slopes, debris piles, river channels, or damaged bridge sections.
For background on major road work and risk management in Pakistan, readers can also see Budget 2026: Key Highway Projects for Pakistan and Rs. 5 Billion for 102 km Karakoram Highway Relocation.
The next key test will be whether safety improves before the next incident, not only how fast debris is cleared after the road is blocked.
Explore DrivePK services
Buying or selling a vehicle? Explore DrivePK services, including car inspection, Sell It For Me and Featured Listings, and choose the option that fits your needs.
For more updates, visit DrivePK.com
Tags
Share this article
About the Author

Dr Khan
Automotive Expert & Content Strategist
Comments (0)
Login Required
You need to be logged in to comment on this article.
No comments yet. Be the first to share your thoughts!
Related Articles

Rawalpindi Approves Rs. 6.5bn Road Schemes
A Rs6.5bn plan for 18 roads around Rawalpindi is circulating—but without official documents, it remains an unverified report, not a confirmed project.

Punjab Driving License Services Suspended for DLIMS Upgrade
Punjab driving license services may be disrupted during a DLIMS upgrade. Check official updates before visiting a licensing center to avoid a wasted trip.